Project Details
- Demolition of existing Concrete pipe culvert.
- Over excavation and disposal of unsuitable fill, requiring dewatering.
- Construction of new reinforced concrete base slabs, wing walls and placement of 26 units of 1200Lx1200Wx900H RCBC’s
- Construction of an 85m reinforced concrete floodway over the culverts
- Rock pitching of 650T of rock spalls around culverts and length of floodway batters.
- Creek dewatering
- Tree removal, clearing and grubbing.
- Traffic management, full road closure and detour in place.
- Liaising with local farmers to ensure all stakeholders were satisfied.
|
|
|