Project Details
- Excavation to suit design layout, including stockpiling of the various excavated materials for reuse or spoil.
- Load and haulage of 23,000m3 of imported soil for construction of pond embankments.
- Supply of water for dust suppression and soil conditioning.
- Fill placement to suit design layout.
- Installation of geotextile and HDPE liner.
- Supply and installation of fencing and gates around the perimeter of the ponds.
- Installation of pond escape safety system.
|
|
Key Information
Contract Period
3 Months
Client:
The City of Armadale
Contract Value:
$1.0m
|
|